Sides of a triangle. |
After the session in Class we resorted back to the E-Shed.My assigned group was to continue with the Gable Roof exercise.I started with making the Raking frames for the build,Then moved onto making the Outriggers,There are 3 out riggers on each side of the Gable roof,They are evenly spaced out and nailed into the rafters on the inside of the roof so that the fly rafters can be attached at the end of the roof on the outside.They also have plumb cuts at the top so that they can evenly join up to the Ridge board.With the Raking frame,We have studs that run from the bottom plate to the top of the raking plate with the top being on a 40 degree angle.For the center stud,we have 2 40 degree cuts on the top so that it sits flush within the top of the raking plates.Once all fit nicely we skew the nails through to sercure it all into place,I used 3 inch nails as this is only a small exercise.
Tomorrow we should have the task complete,All we have left to do is the purlins down the far end along with the fly rafters.Then we can get back to the house build.Mostly all the purlins have been installed to the house trusses,Attached with 2 4 inch nails top and bottom and a purlin screw in the middle,The nails are hit in on angles to prevent uplift of the roof in ruff weather conditions.
No comments:
Post a Comment