Monday, 27 August 2012

28/8/12

So today we installed the rest of the batts in the exterior walls of the house.There were 2 types of batts for the build.Batts for the walls and batts for the ceilings.The way I get the batts all nice and snug is by putting the first corner in and cutting the last part on the dwang and stud.With a 10mm over hang for the hole making it a nice and tight fit without creeses.The insulation will be useless if the batts aren't installed properly.There can't be any gaps at all.


Batts to be put behind the wiring.
We had all the batts in before 9am ready for the inspector to arrive and assess the building for our inspection.He showed us the small device for measuring the moisture content in the timber.The device had 2 prongs in the end which you stab into the timber to get the reading.He tested each wall in the house,It needs to measure around 18.  3 above or below.The house passed with flying colours.



Installing Batts.
After smoko,me and Brad went and continued with the top weather boards so that we can continue with the corner caps of the house along with the beads.The gib will be arriving today so we will be ready to start that and possibly have it finished next week.

Monday, 20 August 2012

21/8/12

So today I had to go up onto the roof and finsh the last side.We laid all the sheets of iron out on the ground and marked it all out with a straight edge and whiteboard marker.We don't use pencil as we found out that the water will make it rust because it is made out of graphite.Once all was marked out,we then used the nibler to cut the marked lines.We then used the offcuts from the otherside of the building.I used the same pattern for the screws.screw one in,miss 2,screw one in miss 3.Chalk lines were used again to ping where the purlins are under the sheets.

The corner scribers are all cut to the right lengths and primed up.The batts all arrived today,So we will be getting stuck into the flashings,and batts tomorrow.Then we should be doing Gib and the rest of the flashings.

Monday, 13 August 2012

14/8/12

We went upstairs for a class session with Matt this morning.We went back over the types of wood that can be used in the building industry.There are 3 different catagories that we put them into;Indigenous,Exotic and imported.We went back over these as we have a written assessment to do tomorrow.

After the classroom went headed back to the e shed where we carried on with the build.I continued with the scribers,I have got all my scribers within reasonable distance on the weatherboards.I had to go and nail off the remainder of the wall claddings on the house.Me and Conan went to the Joinery room with Matt and ripped down some weatherboards on the table saw.Then we marked out where the window openings were on the board.I also learned how to make head flashings for the windows.I used snips to cut the flashings to the right lengths.Then they are nailed above the windows.The weatherboard that is cut to fit can then be put up and nailed off.

Sunday, 12 August 2012

13/08/12

My first attempt at making my first scriber.
So today we got straight into the build,We had no more paper for the roof so that was left on hold.I was shown how to do scribers for the outsides of the facings for the windows.I measured the facing boards and added another 50mm on top of the overall to give me plenty of over hang.The bottom cut for the scriber was cut at 15 degrees.I made a 30mm guide that I leaned up against the side of the wood and tacked it in place.Then used the guide to mark down the sections that need to be cut.I used the table(ripping)saw to nicely cut the sections out.Once I had a nice tight fit then primed up the cuts and put it in place then tacked it,checked it,then nailed it off home.I repeated this for both sides of the window.


Scribers for the outside of the bathroom.
Everyone else was installing foam around all the windows and doors.This is to prevent drafts of cold air entering the house from the outside,and to keep warm air in the house.We will be ready for batts this week if they arrive.Then Gib can be chucked in,once the walls have been checked for square again,The rest of the roofing iron should be put up and done leaving us with the flashings for the hips and ridge.